21 August 2013 at 10:35 am #207257
Cambell MM0DXC
ModeratorLighthouse weekend is out of the way and after discussions with a few guys it is clear that an amount of prior planning is required.
Firstly, in order to plan the construction, operating and deconstruction of the station, it would help me a great deal if I knew who was attending, when and for how long.
The van / vans need to be loaded on Thursday 24th October in order to be able to leave early the next morning.
The station will be constructed on Friday 25th and work will begin at 1st light, probably about 7:30 to 8am. It is important that this work is completed by approximately 4pm as at that point we will be losing light.
The contest begins at 1am (local time) on Saturday 26th and will have a duration of 48 hours. As usual, we will be entering the “Multi Two” section meaning Multi operator, Two radios. This means we need 2 radios manned for the full 48 hours. The contest finishes at 24:00 on Sunday 27th
The station needs to be dismantled and all equipment stowed on Monday 28th from first light, we are normally completely done by mid afternoon.
21 August 2013 at 10:36 am #207258Cambell MM0DXC
ModeratorMM0DXC – Full duration
21 August 2013 at 3:31 pm #207538Geoff MM5AHO
MemberI’m available from evening Thursday (I’m working that day) through to evening Monday. (ie full duration).
And available for nightshifts, cooking, assembly / disassembly, running massive pileups at phenomenal QSO rates and any other duties allocated.
Geoff21 August 2013 at 4:37 pm #207539Anonymous
InactiveAvailable Thursday thro to Monday daytime
21 August 2013 at 5:12 pm #207540Bob GM4UYZ
ModeratorFull time… Friday through to Monday.
21 August 2013 at 8:06 pm #207541Robin MM0VTV
MemberWill be there but cannot confirm dates as yet.
22 August 2013 at 3:59 pm #208100Geoff MM5AHO
MemberThe dates are in the original post Robin…
22 August 2013 at 4:31 pm #208101Cambell MM0DXC
ModeratorHe means he hasn’t secured the holidays from work yet.
So far we have
GM4UYZ – Shack
GM4IKT – 10m
Unasigned – 15m (on pipe mast)
MM5AHO – 20m (with pully for 160m)
MM0DXC – 40m (with pully for 160m)
MM0VTV – 80m (dipole from lighthouse to flag pole)
We still need at least 3 more people for antenna construction and 1 person to install coaxes / rotator cables.
22 August 2013 at 6:58 pm #208102Brian M0RNR
MemberI’m available from Friday Lunchtime (approx 1230 by the time I get up) to Monday when we leave site. I’ll do anything required including being Geoffs Soux Chef. Oh and I can talk a bit so operating might be quite useful.
see you at the party
RNR
23 August 2013 at 12:21 pm #208382Cambell MM0DXC
ModeratorGM4UYZ – Shack
GM4IKT – 10m
MM0GZZ – 15m (on pipe mast)
MM5AHO – 20m (with pully for 160m)
MM0DXC – 40m (with pully for 160m)
MM0VTV – 80m (dipole from lighthouse to flag pole)
M0RNR and everybody – Cable Monkeys
We still need at least 2 more people for antenna construction
24 August 2013 at 11:46 am #208947Cephas MMØINS
MemberI’ll be there for the full duration.
Happy to do anything. Arm is now fine so no restrictions.
Cephas
MM0INS24 August 2013 at 11:56 am #208949keith
MemberHi
planning to take part this time. I can cook if needed, bugger all use at anything else. planning Friday to Monday, I have permission.Keith
MM0KTC25 August 2013 at 10:56 am #209513Cambell MM0DXC
ModeratorGM4UYZ – Shack
GM4IKT – MM0INS – 10m
MM5AHO – MM0GZZ – 20m (with pully for 160m) + 15m (on pipe mast)
MM0DXC – MM0VPR – 40m (with pully for 160m) + 160m
MM0VTV – 80m (dipole from lighthouse to flag pole)
M0RNR and everybody – Cable Monkeys
MM0KTC – Tea Based Refreshment Co ordinator
27 August 2013 at 6:36 pm #210913keith
Membersalad and gin for all then!
27 August 2013 at 11:03 pm #210914Duncan MM0GZZ
Memberooo thats a bit strong tha salad that is hi hi
-
AuthorPosts
- You must be logged in to reply to this topic.